Production Capability:
The First factory is located in Shijia Zhuang, Heibei Province.
The production base covers more than 13,000 square meters with 35 employees, has built the largest organic boronic acid production line, which have the ultra-low temperature reactors in sizes with 4 sets of 500L, 1 set of 300L and 1 set of 200L. It has been attained annual production capacity of 8 tons of OLED intermediates.
The Second factory is located in the Handan New Chemical Park, Heibei Province.
The production base covers more than 33,350 square meters, would be started mass-production in June 2018. It will attain annual production of 50 tons of OLED electronic materials.